Turnkey Silo Replacement

Problem: Huge Aluminium storage silo for plastic pellets collapses during improper filling process.

Resolution:Two man crew from TAL-MAR removed the existing collapsed silo, installed, new equipment and replaced all ladders, handrails and platforms -- in just 4 days. Follow the story in these pictures step by step.

...
Crane moves in to remove collapsed silo.
...
Fastening C-Clamps onto the angle ring frame of the new silo, before attaching lifting slings, silo still on flatbed.
...
Beginning to lift the unit off the flatbed prior to attaching four lifting slings onto attachments already welded onto the top of the silo.
...
Collapsed silo being removed by crane.
...
Crane swings new silo up and around existing other silos, setting it down between two other large units with care.
...
Silo on its way up from the ground to be fastened into place -- on previously welded anglle ring of old (existing) silo.
...
Replacement unit being delivered on flatbed.
...
Field crew boss raises his hand in salute to let ground crew know the new unit is in position & secure.
...
Final View: Existing ladder, platform, and handrails have been re-welded into position. The equipment is hooked up and ready to run!!!